Buy Add to Lightbox
After spending much of the working day below deck on the Lower Lakes Towing ship Saginaw, a hungry work crew discovers a sunny and balmy day above deck. An unidentified worker gives the thumbs up while heading for a lunch break on the dock located in the North Slip. Below deck the blast area is being rebuilt by the Lower Lakes Ship Repair Company LTD.
After spending much of the working day below deck on the Lower Lakes Towing ship Saginaw, a hungry work crew discovers a sunny and balmy day above deck. An unidentified worker gives the thumbs up while heading for a lunch break on the dock located in the North Slip. Below deck the blast area is being rebuilt by the Lower Lakes Ship Repair Company LTD.
Filename: 201700937.JPG
Copyright

View This Image's Galleries:
2017 Front Page, Vol. 4 Issue 10--03/09/17
Keywords:
The Sarnia Journal
Ontario
newspaper
North Slip
ship
repair
winter